Why Suppliers Ask For Door Schedule Before Quotation

20-06-2026

Why Suppliers Ask For Door Schedule Before Quotation

For fire rated glass door projects, a door schedule helps suppliers confirm door size, quantity, fire rating, opening direction, frame type, hardware and installation location before quotation. Without it, the quote may be inaccurate or incomplete.

Get Quote

Why A Door Schedule Matters

Fire rated glass doors are not quoted only by glass size. A complete door system may include fire rated glass, frame profiles, seals, hinges, closers, locks, handles, panic bars and access control hardware. A door schedule allows suppliers to understand the full scope before pricing.

For contractors, sending a clear door schedule can reduce quotation errors, missing hardware, production changes and installation delays.

fire rated glass door schedule

1. Door Size And Quantity

The door schedule should clearly list each door opening size, door leaf size and quantity. This is especially important when a project includes single doors, double doors, side panels or transom panels.

  • Door number or location code

  • Opening width and height

  • Single or double door type

  • Glass panel size

  • Quantity for each door type

2. Required Fire Rating

Different doors in the same building may require different fire ratings. A staircase door may need EI90, while an internal office partition door may only need EI30 or EI60. The door schedule helps suppliers match each door with the right fire rated glass system.

3. Opening Direction And Hardware

Door opening direction affects hinge position, closer selection, panic bar layout and access control design. If this information is missing, the supplier may quote the wrong hardware or leave key items out.

  • Left-hand or right-hand opening

  • Inward or outward opening

  • Door closer requirement

  • Panic bar requirement

  • Lock, handle or access control requirement

  • fire rated glass door quotation

4. Frame Type And Finish

A door schedule should also mention whether the project needs steel frame, aluminum frame, slim frame or frameless design. Frame finish, color and profile depth can affect both price and production time.

5. Installation Location And Wall Type

Suppliers need to know where each door will be installed. Doors for corridors, staircases, escape routes, hospitals, hotels, offices, data centers and electrical rooms may require different system details.

Wall type and wall thickness should also be confirmed because they affect frame fixing and installation method.

fire rated door schedule for contractors

What A Good Door Schedule Should Include

  • Door number or project location

  • Opening size and door leaf size

  • Quantity

  • Required fire rating

  • Single door, double door or side panel design

  • Opening direction

  • Frame material and finish

  • Hardware requirement

  • Wall type and wall thickness

  • Delivery schedule and installation area

Conclusion

Suppliers ask for a door schedule before quotation because it helps confirm door size, quantity, fire rating, frame system, hardware and installation details. For contractors, preparing a clear door schedule can make the quotation faster, more accurate and easier to compare.

Need A Fire Rated Glass Door Quote?

Send us your door schedule, drawings, fire rating and hardware requirements. Our team will help review the system and provide a suitable quotation.

Contact Us Get Quote